Rebuilding at Lake Village
Followers
Blog Archive
▼
2010
(144)
►
June
(3)
►
May
(11)
▼
April
(56)
4-15 working on wall colors for 17
4-13 John with Greg our contractor
4-19 clean up of 17
4-19 master bedroom in 17 primed
4-19 lower level of 17 primed
4-18 lower lever of 17 textured
4-19 lower level of 17 primed
4-14 Taping lower level in 17
4-13 lower level in 17
4-13 taping lower level in 17
4-16 taping utility room in 17
4-19 Doorway in 20 framed
4-19 Cory working on the finished carpentry in 20
4-19 hallway in 19
4-19 posts for railing in 19
4-19 #19
4-19 cabinets for 19
4-19 working on the cabinets for 19
4-19 kitchen cabinets for 20
4-12 kitchen in 20 textured
4-10 porch of 18 awaiting railing
4-19 lower level color in 18
4-19 upstairs bedroom color in 18
4-19 pendant lights for 18
4-19 chandelier in 18
4-19 Fan lights in 18
4-19 Glass blocks in 18's bathroom
4-19-10 granite, tile and cabinet in 18's bathroom
4-15 sink and cabinet in 18
4-19 the tiler at work in 18
4-19 Backsplash and granite counters of 18
4-19 Tiling 18's bathroom closet
4-15 Working on 18's jacuzzi tub
4-9-10 Acid washing the beams in 17
4-9-10 Cleaning the beams in 17
4-9-10 Working on the deck for 17
4-9-10 working on the deck for 17
4-9-10 Finishing up the radiant heat outlets
4-9-10 Jay working on some finishing touches
4-9-10 beams are stained in 18
4-9-10 window sills for 18
4-6-10 First floor done
4-6-10 continuing the pouring
4-6-10 Pouring the concrete covering
4-6-10 Making the concrete covering for the radian...
4-1-10 New doors for 18
4-2-10 plastering 20
4-2-10 Walls are plastered in 19
4-2-10 New dining cabinets for 18
4-2-10 Installing cabinets for 18
4-1-10 Unloading cabinets for 18
3-31-10 Janet of 18 with new bathroom color
3-31-10 Janet of 18 and her new wall color
4-1-10 Front stairs of 17
3-31-10 Plastering #19
3-31-10 Plastering #19
►
March
(36)
►
February
(26)
►
January
(12)
►
2009
(217)
►
December
(23)
►
November
(22)
►
October
(41)
►
September
(36)
►
August
(95)
►
2007
(2)
►
October
(2)
Contributors
John
Sybil
Terry
Monday, April 19, 2010
4-13 John with Greg our contractor
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment