Rebuilding at Lake Village
Followers
Blog Archive
▼
2010
(144)
►
June
(3)
►
May
(11)
►
April
(56)
▼
March
(36)
3/22/10 Possible color choices for 18
3/22/10 Half way done
3/19/10 Reading the directions to put the radiant ...
3/22/10 John with finished manifold
3/20/10 Finished manifold
3/19/10 Working on connecting the piping to the ma...
3/12/10 Zone manifold for the radiant heat
3/16/10 Finished radiant heat piping in 17's low...
3/11/10 Doing the kitchen of 17 with radiant hea...
3/11/10 Woring on the radiant heat piping
3/11/10 getting the piping ready to uncoil
3/11/10 Loading the piping for the radiant heat
3/22/10 Almost finished with the stairs of 20
3/22/10 Working on the deck of 18
3/19/10 Working on the deck of 20
3/22/10 Starting drywall taping in 19
3/22/10 The walls in 18 are plastered
3/05/10 Finished deck and stairs of 19
3/15/10 Lynne in her unit #19
3/15/10 Lynne from 19 with Jessica - Greg's girl f...
3/15/10 John from 17 with Janet in 18
3/15/10 Homeowners and contractor in 18
3/15/10 Meeting of the home owners or representatives
3/5/10 taking a break from the installation
3/5/10 Installing the sheetrock
2/25/10 Gregg, the foreman, always coordinating w...
2/25/10 Installing the mantel over the fireplace i...
2/25/10 Sheetrocking 18
2/25/10 Sheetrocking 19
2/25/10 Fireplace and front entry in 19
2/25/10 constructing the deck for 20
3/2/10 Gregg with Robert installing additional in...
2/23/10 Moving the sheet rock throughout the unit
2/23/10 Some of the sheet rock entering through th...
2/23/10 inside view of sheet rock
2/23/10 Loading the units with sheet rock
►
February
(26)
►
January
(12)
►
2009
(217)
►
December
(23)
►
November
(22)
►
October
(41)
►
September
(36)
►
August
(95)
►
2007
(2)
►
October
(2)
Contributors
John
Sybil
Terry
Tuesday, March 9, 2010
2/25/10 Fireplace and front entry in 19
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment