Rebuilding at Lake Village
Followers
Blog Archive
▼
2010
(144)
►
June
(3)
►
May
(11)
►
April
(56)
►
March
(36)
▼
February
(26)
2/21/10 One wall insulated in 17
2/21/10 Terry working with the insulation
2/20/10 John putting up insulation on the inside f...
1/13/10 A beautiful day in Tahoe
2/18/10 Trex boards for the deck on 17
1/18/10 The front dodor for 17 set for fit
1/28/10 the finished vent for the fireplace
1/28/10 Cutting the hole for the fireplace vent
1/28/10 the installed fireplace for 17
1/26/10 Reading the instructions for installation
1/26/10 The Fireplace for 17 ready to be installed
2/17/10 Radiant Heat piping
1/28/10 The electrical panel before connections
1/26/10 The electrician at work
2/18/10 The skylights in 17
1/27/10 Found them
1/27/10 Cutting where the skylights are
1/27/10 Hoping to find the skylights
2/9/10 Checking on a leak after a plumbing test
2/12/10 John & James from Tri County cabinets
2/12/10 John and James from Tri County Cabinets
1/17/10 Finishing the roof on 17
1/17/10 Finishing the roof at 17 just before the s...
1/12/10 Sending the roofing material to the roof
2/12/10 Duct Work at 18
2/12/10 Fireplace at 18
►
January
(12)
►
2009
(217)
►
December
(23)
►
November
(22)
►
October
(41)
►
September
(36)
►
August
(95)
►
2007
(2)
►
October
(2)
Contributors
John
Sybil
Terry
Monday, February 22, 2010
2/12/10 Fireplace at 18
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment