10-14 The wind helped dry things out
10-14 Collection of rain water in 19
10-14 It rained inside #17
10-12 Terry looking at access door for 17
10-12 Steps to the parking lot from 18
10-6 Getting the laundry room ready for 17
10-6 Walls are going up for 19 and 20
10-5 Gregg chiseling a rock to fit the deck for #20
10-5 The snow has melted
10-5 Snow was melting by 11:30am
10-5 Another view of the moon
10-5 The moon was still out at 7:30am
10-5 More shoveling
10-5 Workers with hand made shovels
10-5 John going to take pictures of the snow
10-5 More snow views
10-5 Surprise. The first snowfall the day before
10-2 The game room for 17
10-2 the laundry and bathrooms for 17
9-30 In the lower level of #17
10-2 One of the workers
10-2 the parking spot and walkway for 17
10-2 Compacting the asphalt
10-2 Spreading the asphalt for 17
10-2 Getting ready to do the driveway for 17
10-2 Finishing up the asphalting for #18
10-2 Asphalting #18's steps
10-1 #20 and #19
10-2 Ready for the fireplace for #17
10-1 John at our fireplace
10-1 Almost done with the cover
10-1 A big tarp to cover the exposed ceiling
9-30 Getting ready for any storms
9-29 Our first animal visitor
9-29 Terry looking at #17 and #20
10-1; temporary stairs for #17
9-28 John going up to our front door
9-28 Unit #19
9-28 Unit #20
9-28 Gregg making the step forms for 18
9-25 John helping with the clean up
►
September
(36)
►
August
(95)
►
2007
(2)
►
October
(2)
Contributors
John
Sybil
Terry
Monday, October 5, 2009
9-29 Terry looking at #17 and #20
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment