9-23 Roof of 18
9-23 /Terry checking things out at 17
9-23 John going up to top floor of 17
9-22 Posts for the decks are painted
9-22 Starting the foundation for the roof of 17
9-21 Laying a pad for the lower level of 17
9-21 Laying a pad for 19
9-21 Laying a pad for the fire sprinkler controls
9-21 Laying a pad at the entry of 17
9-18 More ceiling for 17
9-18 The heating ducts for 20
9-18 The fir beams and ceiling for 17
9-18 Walls are going up for 19
9-15 working on the roof of 18
9-15 More construction on 20
9-15 Starting the walls for 20
9-15 Starting the ceiling on 17
9-14 Taking out the trash from the site
9-3 Heating system for #19
9-14 Starting floor for #20
Sept 14, 2009
9-14 John on fireplace beam in 17
9-10 #18 installing ceiling in bedrooms
9-9 3 inspectors, 2 workers installing water conne...
9-5 One of our furry friends finding lunch
9-2 Putting in water line for sprinkler system
9-1 Janet from #18 on her deck
Sept 1, 2009
9-1 #19 floor
9-15 Starting walls for #19
8-27 Fireplace beams in #17
8-27 #18 ceiling
8-24 Walls are going up for #17
8-24 Getting ceiling on dining in #17
8-24 Looking at kitchen, dining from bedroom in #17
8-24 Wall set up for #18
►
August
(95)
►
2007
(2)
►
October
(2)
Contributors
John
Sybil
Terry
Thursday, September 24, 2009
9-18 More ceiling for 17